Case Study
Kuraray Achieves Permitting and Safety Best Practices with Prometheus ePAS
With Prometheus ePAS, Kuraray has been able to complete their morning rush for permits 1.5 hours quicker, issue 8,000 permits due to winter storm Uri, perform permitting from mobile devices online and offline, and view their full history of Lock Out Tag Outs (LOTOs) and associated jobs within ePAS.
Download